DYC-932,two-component environmentalfriendly polyurethane waterproof coating, as a result of reaction of two components, A and B, is a reacting waterproof coating. By composition of component A and B,component A is the polyurethane prepolymer which is composed by esserbetol and diisocyanate. The...

Product Details

 Double Units Polyurethane Liquid Membrane

DYC-932,two-component  environmentalfriendly polyurethane waterproof coating, as a result of  reaction of two components, A and B, is a  reacting waterproof coating. By composition of component A and B,component A is  the polyurethane prepolymer which is composed by esserbetol and diisocyanate.  The B component is viscous liquid which contains perssad OH, such as  surfactant, filler,curing agent, catalyst. When using, mix component A and B,  according to a certain weight ratio.Hours later, elastic,tenacious,durable waterproof  coating layer comes into being.
 alant  to roll material close up and divider seam around pipeline.

 Features
 High  strength, good elongation rate, high solid content, strong adhesive.
 Good  machanical property, stable weather resistant ability.No coal tar, safe and  environmental friendly.
 Good  adaptability to substrate deformation, easy install for complex surface  transition.
 

Executive Standard 

Standard:GB/T19250-2013

ITEM

Index

Solid content  %  ≥

92.0

Surface dry  h  ≤

12

Hard dry  h  ≤

24

Tensile strength  Mpa  ≥

2.00

6.00

Elongation at break  %  ≥

500

450

Tearing strength  (N/mm)  ≥

15

30

Low temp bending

1.0

Oil permeability, Piece  ≤

-35℃, no cracking

Water tightness

0.3Mpa, 120min, no leakage

Heat expansion rate  %

-4.0~+1.0

Adhesion strength  Mpa  ≥

1.0

Moisture absorption  %  ≤

5.0


Construction Method
 1. It’s necessary to clean the  dust, sand material, mortar, lumps and other debris before the construction.
 2. The base surface should be dry,  smooth, non- porous, sand or cracks. Cracks need to be filled by cement mortar.
 3. When use,we mix component A and  B at certain proportion, and being stirred well. One time stirred coating  should be used within 2 hours. After fully dry, it can be painted again. The  direction of second time painting needs to be perpendicular to the first time  painting. Make the film uniform, and the joint and angle should be construction  according to the design requirement.
 4. The brushed waterproofing layer  should be protected by the cement mortar in time.
 

Construction Attentions:
 1. Mix component A and B as the  package’s proportion and stirred it well, it should be used out within 2 hours.
 2. After fully dry, it can be  constructed again.
 3. Construction in cloudy days is  strictly prohibit, it can not contact with the rain before fully dry .
 4. The temperature for application  should be 5~35℃.
 5. The base surface should be dry  in the underground construction, and it should be constructed after 24 hours of  the drain process.


     component(s)

Approx 
     Unit N.W

Barrel 
     Weight

Barrel size

Approx
     Unit CBM

Ref.
     USAGE

Remarks

kg/Set

kg/barrel

Dia*Height (cm)

cbm/set

kg/

A:B=1:3

27

A:20kg
     B:7kg

A:26cm*27cm
     B:23cm*32cm

0.035

2.1-2.3

Thickness based on 1.5mm

2.8-3.1

Thickness based on 2.0mm


Application
 1)  Basement, bathroom, kitchen & balcony of various industry and civil  buildings;
 2)  Metro platform, parking lot and other municipal engineering;
 3)  Water pools and pipe drain.
 

How to Storage

  • 911  Elastic Waterproofing Coating is supposed to be sealed and stored in a cool and  dry place, free from sun exposure, damp and fire.

  • Storage  period is 12months.

  • Packing  is metal drums, which should pile upright.

  • Piles  of buckets should not exceed 4 layers.


image002.jpg

image001.jpg

Inquiry